Whitehaven Metallurgical Coal Acquisition Presentation
3 Transforms Whitehaven into a metallurgical coal
producer, in line with strategy (cont.)
Total Coal Resources³ (Mt, % equity basis)
Recoverable Reserves³ (Mt, % equity basis)
LONG-LIFE ASSETS1
+75%
■
Blackwater mine life could extend beyond 50 years 2
4,563
■
Daunia production expected until FY40
■
Winchester South scoped for >20 years
☐
Resources increase 75% from 2.6bn to 4.6bn tonnes
of Total Coal Resources for operating and
development mines
3,052
+29%
2,611
1,100
1,304
Reserves increase 29% from 1.0bn to 1.3bn tonnes
1,011
of Recoverable Reserves for operating and
673
development mines; Recoverable Reserves from
380
operating mines increases 46% to 924Mt
1,511
1,511
631
631
☐
Exploration planning to focus on converting
Standalone
Pro-forma
Resources to Reserves at Blackwater
Standalone
Pro-forma
Extends and strengthens Whitehaven's future
Bowen Basin
Gunnedah Basin
Source: Company filings and disclosures
1.
Shown on an equity % basis
2.
17
Based on conceptual mine planning with mine life dependent on prevailing local and macro economic conditions
3.
Total Resources includes Measured, Indicated and Inferred Resources. Reserves and Reserves include Maules Creek, Narrabri, Vickery, Tarrawonga, Werris Creek in Gunnedah Basin and Daunia,
Blackwater and Winchester South in Bowen Basin
WHITEHAVENView entire presentation