jetBlue Results Presentation Deck
Maintaining Focus on Controllable Costs
Guidance
2.5% to 5.5%
CASM ex-Fuel (¹) YoY
5.9%
3Q23
8.5% to 10.5%
4Q23
Focused on Meeting Cost Targets, Structural Cost Program Savings
Accelerate in 2H
●
●
Continued Challenging ATC Environment Impeded Cost Execution
Excluding weather and ATC challenges, 3Q tracked near midpoint of initial guidance
Planned operational investments added ~4 points of 3Q CASM
Unplanned disruption costs due to greater convective weather and ATC delays
versus plan added incremental ~1.5 points of 3Q CASM
●
●
Structural Cost Program remains on track to deliver $70M in cost reduction by the
end of 2023 and $150-200M through 2024
Expect to save $75M from fleet modernization program through 2024, with over half
of savings realized to-date
●
Geared Turbofan Powder Metal Defect Expected to Impact 2024 Growth
Six aircraft currently out-of-service and expected to rise to high-single to low-double
digits by year-end 2024
(1) Operating expense per available seat mile, excluding fuel and related taxes, other non-airline operating expenses, and special items; refer to
jetBlue reconciliations of non-GAAP financial measures in Appendix A
10View entire presentation